Vertical Overhead Drilling&Incline Drilling in Reinforced Concrete Tunnel

Print

Core drilling in HYDRO ELECTRIC POWER PLANT PROJECT can be complexed jobs because of special requirements such as overhead core drilling without danger from electric shock and precise angle of holes required.

ABOVE :  Diamond Core drill for maintence in HYDRO ELECTRIC POWER PLANT PROJECT.

---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

 

 

ABOVE : Overhead core drilling 1.5 to 2 meters(Deep) at HYDRO ELECTRIC POWER PLANT PROJECT by a special core drill machine. Angle of core drill are precise adjustable X-Y AXIS to suit customer requirement(Standard machine available on market can be adjust on one AXIS.). 

 

Any questions, please contact Bundit Kalinvidhaya CELL PHONE : ++66-81-694-7170

                                                 OFFICE TEL. : ++66-2-295-0791 to 93, OFFICE FAX. : ++66-2-295-0794,++66-2-294-7434

                                                                              E-MAIL : This e-mail address is being protected from spambots. You need JavaScript enabled to view it   

                                                                                            This e-mail address is being protected from spambots. You need JavaScript enabled to view it  

 

 

 

 

Reinforced Concrete Opening At 3 Meter Depth

Print

 

HYDRO ELECTRIC POWER GENERATION PLANT PROJECTS, OVERSEAS. The task was to cut/remove concrete structure for servicing embeded steel pipe at 3 meters deep and not to disturbing steel pipe. This job had to finnish within limited time. The position of steel pipe was in confine space which heavy machinery such as hydraulic breaker can not be reached and also prohibitted. The job was performed with equipments which carried in by human. We has finnish the whole operation within 5 days with satisfactory result.

 

 

 

 

 

                                                                                           WORK METHOD


 

ABOVE : Cutting back side (of intended opening) by Stitch core drilling , and lift up concrete by splitter(picture showed pre drilling for concrete splitter).


 

ABOVE : Cut vertically on left and right side of Intended opening with diamond wire cutting machine.


ABOVE : Lift up separated concrete by assistance of concrete splitter.


ABOVE : Removed concrete (which covered steel pipe). Not making ant damage to steel pipe.

 

                                                     Any questions, please contact Bundit Kalinvidhaya CELL PHONE : ++66-81-694-7170

                                                 OFFICE TEL. : ++66-2-295-0791 to 93, OFFICE FAX. : ++66-2-295-0794,++66-2-294-7434

                                                                              E-MAIL : This e-mail address is being protected from spambots. You need JavaScript enabled to view it     

                                                                                            This e-mail address is being protected from spambots. You need JavaScript enabled to view it

 


Translate