SUPER STRUCTURE CONCRETE COLUMN REMOVAL (PEEL OFF CONCRETE) NO FOUNDATION DAMAGE(24 WORK HOURS).

 

 

ABOVE : Removed damaged super structure's concrete column 2 meters x 2 meters x 10 meters(Height) and Peel off (exposed Re-Bar) at 4meters length. Ready to RE-CAST to operational structure. The whole operation took 24 work hours to finnish job. No damage to Footing or Nearby structure. 

-------------------------------------------------------------------------------------------------------------------------------------------------

ABOVE : Removed (Damaged concrete) top part of CROSS-HEAD at 7 meters(Height) to Expose original re-bar. Then RE-CAST back to operational structure. Get stronger Concrete structure than Conventional Technique. No need add steel Re-Bar with Epoxy injection. 

 

 